RAJUK Plan Approval & Feasibility Study

Navigate Every Approval With Confidence, Clarity & Zero Delays
Getting a building plan approved in Bangladesh is one of the most critical — and often most frustrating — steps in any construction project. One missing document, one incorrect submission, or one overlooked regulation can bring an entire project to a standstill for months. Envision Group takes that burden completely off your shoulders with a professional, experience-backed RAJUK plan approval and feasibility service that gets your project moving without unnecessary delays.

Approval Is Not Just Paperwork — It Is the Foundation of a Legal, Safe & Valuable Building

Many developers underestimate the importance of a thorough plan approval process until something goes wrong — an illegal structure, a costly retrofit, or worse, a demolition order. At Envision Group, we treat plan approval and feasibility work as a foundational investment in the long-term value, safety, and legal standing of your building.
Our team conducts detailed feasibility studies before any design work begins — analyzing land use regulations, floor area ratios, setback requirements, height restrictions, and utility availability to ensure your proposed development is fully viable before a single rupee is spent on detailed design. This upfront clarity saves time, money, and enormous headaches down the road.
Every approval we secure is built on accurate documentation, thorough regulatory knowledge, and a proactive relationship with the authorities — giving your project a clean, legally sound foundation to build upon.

Deep Regulatory Knowledge That Keeps Your Project on the Right Side of the Law

Bangladesh’s building approval landscape is complex, constantly evolving, and highly authority-specific. What works for a RAJUK submission in Dhaka may differ significantly from a CDA submission in Chittagong. Our team stays continuously updated on the latest regulatory changes, approval procedures, and documentation requirements across all major building authorities. This knowledge allows us to:
The result is a smoother, faster, and far less stressful approval process — with fewer rejections, fewer revisions, and fewer delays holding your project back.

A Clear, Systematic Path From Land to Approved Building Plan

Our structured approval and feasibility process eliminates uncertainty, reduces risk, and ensures your building is legally approved, fully compliant, and ready to build without a single regulatory obstacle standing in the way.

Land & Site Regulation Review

We start by thoroughly reviewing your land documents, site location, and applicable zoning regulations — identifying exactly what can be built, how high, how large, and under what specific conditions based on current authority rules.

Feasibility Assessment

We conduct a detailed feasibility study covering land use classification, permissible floor area ratio, setback requirements, height restrictions, and utility connections — giving you a clear, data-backed picture of your project's full development potential.

Design Brief & Compliance Planning

Working closely with our architectural team, we establish a design brief that is fully aligned with all regulatory requirements from day one — ensuring the building design is shaped around compliance rather than retrofitted to meet it later.

Drawing & Document Preparation

We prepare a complete and meticulously organized submission package — including all required architectural drawings, structural layouts, ownership documents, NOCs, and authority-specific forms — compiled to meet the precise standards of the relevant approval body.

Submission & Authority Liaison

We formally submit the approval package to the relevant authority and actively manage the entire follow-up process — attending meetings, responding to queries, providing additional information, and maintaining regular communication with approval officers to keep things moving.

Approval Clearance & Handover

Once approval is granted, we review the approved drawings and conditions carefully, brief the project team on any approval-specific requirements, and hand over a complete approved document set — so construction can begin on a fully legal and compliant foundation.